Google Cloud OsConfig V1 Client - Class PatchRollout (1.2.2)

Reference documentation and code samples for the Google Cloud OsConfig V1 Client class PatchRollout.

Patch rollout configuration specifications. Contains details on the concurrency control when applying patch(es) to all targeted VMs.

Generated from protobuf message google.cloud.osconfig.v1.PatchRollout

Namespace

Google \ Cloud \ OsConfig \ V1

Methods

__construct

Constructor.

Parameters
NameDescription
data array

Optional. Data for populating the Message object.

↳ mode int

Mode of the patch rollout.

↳ disruption_budget Google\Cloud\OsConfig\V1\FixedOrPercent

The maximum number (or percentage) of VMs per zone to disrupt at any given moment. The number of VMs calculated from multiplying the percentage by the total number of VMs in a zone is rounded up. During patching, a VM is considered disrupted from the time the agent is notified to begin until patching has completed. This disruption time includes the time to complete reboot and any post-patch steps. A VM contributes to the disruption budget if its patching operation fails either when applying the patches, running pre or post patch steps, or if it fails to respond with a success notification before timing out. VMs that are not running or do not have an active agent do not count toward this disruption budget. For zone-by-zone rollouts, if the disruption budget in a zone is exceeded, the patch job stops, because continuing to the next zone requires completion of the patch process in the previous zone. For example, if the disruption budget has a fixed value of 10, and 8 VMs fail to patch in the current zone, the patch job continues to patch 2 VMs at a time until the zone is completed. When that zone is completed successfully, patching begins with 10 VMs at a time in the next zone. If 10 VMs in the next zone fail to patch, the patch job stops.

getMode

Mode of the patch rollout.

Returns
TypeDescription
int

setMode

Mode of the patch rollout.

Parameter
NameDescription
var int
Returns
TypeDescription
$this

getDisruptionBudget

The maximum number (or percentage) of VMs per zone to disrupt at any given moment. The number of VMs calculated from multiplying the percentage by the total number of VMs in a zone is rounded up.

During patching, a VM is considered disrupted from the time the agent is notified to begin until patching has completed. This disruption time includes the time to complete reboot and any post-patch steps. A VM contributes to the disruption budget if its patching operation fails either when applying the patches, running pre or post patch steps, or if it fails to respond with a success notification before timing out. VMs that are not running or do not have an active agent do not count toward this disruption budget. For zone-by-zone rollouts, if the disruption budget in a zone is exceeded, the patch job stops, because continuing to the next zone requires completion of the patch process in the previous zone. For example, if the disruption budget has a fixed value of 10, and 8 VMs fail to patch in the current zone, the patch job continues to patch 2 VMs at a time until the zone is completed. When that zone is completed successfully, patching begins with 10 VMs at a time in the next zone. If 10 VMs in the next zone fail to patch, the patch job stops.

Returns
TypeDescription
Google\Cloud\OsConfig\V1\FixedOrPercent|null

hasDisruptionBudget

clearDisruptionBudget

setDisruptionBudget

The maximum number (or percentage) of VMs per zone to disrupt at any given moment. The number of VMs calculated from multiplying the percentage by the total number of VMs in a zone is rounded up.

During patching, a VM is considered disrupted from the time the agent is notified to begin until patching has completed. This disruption time includes the time to complete reboot and any post-patch steps. A VM contributes to the disruption budget if its patching operation fails either when applying the patches, running pre or post patch steps, or if it fails to respond with a success notification before timing out. VMs that are not running or do not have an active agent do not count toward this disruption budget. For zone-by-zone rollouts, if the disruption budget in a zone is exceeded, the patch job stops, because continuing to the next zone requires completion of the patch process in the previous zone. For example, if the disruption budget has a fixed value of 10, and 8 VMs fail to patch in the current zone, the patch job continues to patch 2 VMs at a time until the zone is completed. When that zone is completed successfully, patching begins with 10 VMs at a time in the next zone. If 10 VMs in the next zone fail to patch, the patch job stops.

Parameter
NameDescription
var Google\Cloud\OsConfig\V1\FixedOrPercent
Returns
TypeDescription
$this