[[["容易理解","easyToUnderstand","thumb-up"],["確實解決了我的問題","solvedMyProblem","thumb-up"],["其他","otherUp","thumb-up"]],[["難以理解","hardToUnderstand","thumb-down"],["資訊或程式碼範例有誤","incorrectInformationOrSampleCode","thumb-down"],["缺少我需要的資訊/範例","missingTheInformationSamplesINeed","thumb-down"],["翻譯問題","translationIssue","thumb-down"],["其他","otherDown","thumb-down"]],["上次更新時間:2025-07-14 (世界標準時間)。"],[[["This guide outlines essential steps to prepare for a scheduled server maintenance event that involves downtime."],["Failure to complete the specified preparatory steps before the maintenance start may lead to cancellation of the maintenance event."],["Preparatory tasks include disabling autostart services, safely stopping applications, silencing monitoring, and rebooting the server 24-48 hours prior."],["It is crucial to power off the server one hour before the maintenance start time."],["No further confirmation is required once these steps have been completed."]]],[]]