[[["易于理解","easyToUnderstand","thumb-up"],["解决了我的问题","solvedMyProblem","thumb-up"],["其他","otherUp","thumb-up"]],[["很难理解","hardToUnderstand","thumb-down"],["信息或示例代码不正确","incorrectInformationOrSampleCode","thumb-down"],["没有我需要的信息/示例","missingTheInformationSamplesINeed","thumb-down"],["翻译问题","translationIssue","thumb-down"],["其他","otherDown","thumb-down"]],["最后更新时间 (UTC):2025-04-03。"],[[["This guide outlines essential steps to prepare for a scheduled server maintenance event that involves downtime."],["Failure to complete the specified preparatory steps before the maintenance start may lead to cancellation of the maintenance event."],["Preparatory tasks include disabling autostart services, safely stopping applications, silencing monitoring, and rebooting the server 24-48 hours prior."],["It is crucial to power off the server one hour before the maintenance start time."],["No further confirmation is required once these steps have been completed."]]],[]]