[[["わかりやすい","easyToUnderstand","thumb-up"],["問題の解決に役立った","solvedMyProblem","thumb-up"],["その他","otherUp","thumb-up"]],[["わかりにくい","hardToUnderstand","thumb-down"],["情報またはサンプルコードが不正確","incorrectInformationOrSampleCode","thumb-down"],["必要な情報 / サンプルがない","missingTheInformationSamplesINeed","thumb-down"],["翻訳に関する問題","translationIssue","thumb-down"],["その他","otherDown","thumb-down"]],["最終更新日 2025-04-09 UTC。"],[[["Promotion disconnects the destination Cloud SQL instance from the source, transforming it from a replica to a primary instance."],["For continuous migrations, promotion should occur after shifting reads and writes to the destination, while one-time migrations are ready for use immediately after the dump and load process is complete."],["To prevent data loss, halt all writes to the source database and confirm the replication delay is at zero before initiating promotion."],["During promotion, the migration job ceases reading from the source, and once completed, the destination instance becomes the primary, writeable instance."],["Promoting failed or manually stopped migration jobs in the CDC phase can lead to data inconsistencies between the source and destination databases."]]],[]]