[[["이해하기 쉬움","easyToUnderstand","thumb-up"],["문제가 해결됨","solvedMyProblem","thumb-up"],["기타","otherUp","thumb-up"]],[["이해하기 어려움","hardToUnderstand","thumb-down"],["잘못된 정보 또는 샘플 코드","incorrectInformationOrSampleCode","thumb-down"],["필요한 정보/샘플이 없음","missingTheInformationSamplesINeed","thumb-down"],["번역 문제","translationIssue","thumb-down"],["기타","otherDown","thumb-down"]],["최종 업데이트: 2025-04-22(UTC)"],[[["Promotion disconnects the destination Cloud SQL instance from the source, transforming it from a replica to a primary instance."],["For continuous migrations, promotion should occur after shifting reads and writes to the destination, while one-time migrations are ready for use immediately after the dump and load process is complete."],["To prevent data loss, halt all writes to the source database and confirm the replication delay is at zero before initiating promotion."],["During promotion, the migration job ceases reading from the source, and once completed, the destination instance becomes the primary, writeable instance."],["Promoting failed or manually stopped migration jobs in the CDC phase can lead to data inconsistencies between the source and destination databases."]]],[]]