[[["わかりやすい","easyToUnderstand","thumb-up"],["問題の解決に役立った","solvedMyProblem","thumb-up"],["その他","otherUp","thumb-up"]],[["わかりにくい","hardToUnderstand","thumb-down"],["情報またはサンプルコードが不正確","incorrectInformationOrSampleCode","thumb-down"],["必要な情報 / サンプルがない","missingTheInformationSamplesINeed","thumb-down"],["翻訳に関する問題","translationIssue","thumb-down"],["その他","otherDown","thumb-down"]],["最終更新日 2025-04-17 UTC。"],[[["Continuous migration involves a full initial data dump and load, followed by an ongoing flow of changes from the source to the destination, with a `promote` operation switching the destination to primary."],["Continuous migration requires a snapshot to be taken, with a brief lockout on database tables, followed by an initial load, and then ongoing changes being captured and processed until promotion."],["One-time migration is a single snapshot of the source database, transferred to the destination as a one-time dump and load, where the destination is ready for use after the load is finished."],["One-time migration requires no further work after the load is completed, and writes to the source must be stopped."],["Dependent applications might encounter downtime during the replication delay in continuous migration or during the entire migration process in a one-time migration."]]],[]]